M1 Tank Test Panel Project

Results
In 1988 as a subcontractor for Chrysler Corporation building the test panels for the M1 Abrams tank. While working as temp labor on an assembly line for the test panel, several thousand wires had been improperly prepared and needed to be reworked. Being the new kid on the block, that laborious task landed on Nicholas having been trained as an electronics technician in the U.S. Navy and Kennedy Space Center and understanding specs for stripping the wires for connection with the test ports and the strict tolerances, Nicholas' job was to clip the wires and re-strip them with a standard set of wire strippers. The problem was that a tech was essentially “guessing” on stripping the wires for the correct amount. Nicholas found that there was a screw in exactly…